Concrete Underground Supply Pumping Ready-Mix

Clients & Projects

Clean Energy

Location: Sidney, Kentucky
Description: Installed 35 permanent mine seals.

Gatling Coal Company

Location: New Haven, WV
Description: Void field, Texflex spraycoating and concrete for slope floor

Independence Coal Company

Location: Madison, West Virginia
Description: Fifty permanent mine seals installed at Justice Mine near Madison, W.Va. Sealed off old tall gate areas of mine to help reduce ventilation, water, and methane concerns.

Independence Coal Company

Location: Madison, West Virginia
Description: We pumped approximately 1100 cubic yards of concrete down a 500' bore hole and approximately 1200' each way out into the mine and partially up the slope incompassing steal track and charging areas along the way to make good solid dry ways of travel for men and materials entering and exiting the mine

McCoy Elkhorn Coal

Location: Pikeville, Kentucky
Description: Sprayed 162,000 SF of Tekflex coating underground at a mine in Pike County, KY

Minova

Location: Kentucky, West Virginia, Illinois, Alabama, Virginia, Pennsylvania, Utah, and Indiana
Description: Mine seals, spray coatings, cutable cribs and void grouting
Price: Ongoing Partnership

Paramount Coal Company

Location: Clintwood, Virginia
Description: Installed 25 permanent mine seals

PinnOak Resources, Inc.

Location: Bessemer, Alabama
Description: Pumped concrete 4,000 ft. underground for slabs and steps from mine to surface for slope rehabilitation

Pocahontas

Location: Pocahontas, West Virginia
Description: Applied Minova's Tekflex spray coating to walls and ceiling of an exibition mine

Road Fork Development, Mine #51

Location: Pineville, West Virginia
Description: In the Fall of 2006, after a long approval process with MSHA accepted a contract to build 8 Ventilation Seal type Bulkheads at Massey's mine near Pineville , Wv. These Buldheads were approximately 24' wide by 30' tall and nearly 18' thick. They had to be constructed using 6' Lincoln Lock Cribs and 5 bucks of scaffolding for placement.

Ruby Coal

Location: East Bernstadt, Kentucky
Description: We installed 85Ld steel track and switches throughout the slop entry to the mind and approximately 500' inby the bottom of the slope. Then we pumped from the surface down the slope for approximately 1750 LF (approx. 1700 CY of 4000 PSI concrete) and placed it around the rail all the way out of the slope to the supply yard. This project enabled Ruby Energy to access their mine faster, safer, and with less mechanical problems for their equipment.

Wright Concrete  |  Wright Underground  |  WrightWay Supply  |  WrightWay Pumping  |  WrightWay Ready-Mix
Copyright © 2008 Wright Concrete & Construction, Inc., Wright Supply Enterprises, Inc., WrightWay Pumping Enterprises, Inc.,
Wright Underground Concrete, LLC, and WrightWay Ready-Mix, LLC. All rights reserved. · Website Designed by FarleyBuilt

FarleyBuilt